S
ERVICES
 
Q
UICK
 
C
ONTACT US
  • SERVICES |TELPHONE
  • TEL:18680299016
  • QQ:649531270
  • E-MAIL:lujackly@126.com
Information
NEWS
The empty container terminal operation
Hit: 5126 Data: 2012/11/2

Container terminal operation main points of empty empty empty into play, operation and management part two.

One, the empty approach operation

Dock empty entry in two ways, empty eontainers ship unloading approach and empty container by inspecting the mouth approach. Empty container unloading the ship before the approach, dock yard planner must arrange for empty container storage plan. The planning principle for the empty box size, according to the different type, different, according to different holding box to separate storage, dock and the ship must be in the unloading handle eir procedures.

Through the examination of the mouth into the empty box mainly has two kinds, one for the shipping companies designated for export shipping box, a box of imported heavy returned to dock. As for the shipping companies designated use, according to the yard planner for storage schemes with different size, different type of box, click export vessel name, voyage stacking; such as import container devanning back yard, according to the yard planner for stockpiling plan with a box of different people, separately stacking. Empty into the inspection port, dock examination of the mouth and the carrier must handle presentation procedures.

Two, the empty stage operation

Dock empty played mainly in two ways, empty container shipping out and empty container by inspecting the mouth out.

Empty shipping on two main, a shipping companies designated for export shipping container, another for the empty container barge. Terminal box works administrator should according to agency issued work contact list, bill of lading or empty boat company offers " export shipment with the instruction ", with plans to arrange shipment. Dock stowage planner according to box works administrator with plans and agents to provide " dock receipt ", combined with the vessel name, voyage of the stowage plan, select all empty or partially empty vessel allocation plan. Where the ship voyage to empty container shipment, the administrator should make records, for a voyage on board the.

By examining the mouth out empty mainly has the following three kinds:

( 1) the door to door to empty, is the main export goods with the lifting container. The empty container lifting point to container packing, heavy box that is shipped back to the dock for shipment export. Empty container door / door from port, the owner or inland carrier shall submit a written application to the container agent. Container agents according to " export container preliminary list " to the owner or inland carrier issued " play equipment interchange receipt " and "enter the arena equipment interchange receipt ". The owner or inland carrier with exit container equipment handover one-way yard extraction container.

( 2) a single mention of empty containers, refers to the empty container lifting to dock of container yard ( CY ). As a ship company of empty eontainers to port storage yard, proposed rent box. Terminal box works administrator should be based on the shipping company or its agent 's "empty lifting contact list " box, contact list General shall state holding box, carrier fleet, to the yard, and indicate the cost of clearing method.

( 3) for inspection, repair, cleaning, fumigation, transit and other reasons need to carry empty container wharf. A freight forwarder or carrier to inland container agent to submit a written application, container agents according to the principal-agent relationship or agreement relating to the cargo or inland carrier issued " play equipment interchange receipt " and "enter the arena equipment interchange receipt ". The merchant or inland carrier with a " play equipment interchange receipt " to the yard extraction box, dock with acting work contact single box. Empty container appearances, dock and ship or carrier shall make good container equipment handover and handover procedures.

Three, storage yard container management

Dock yard for storage of empty basic stacking principle, according to hold the box and the box dimensions of different separately stacking. The pier with a special box storage box area, generally 4 to 5 layers of empty containers can be stacked. When the dock in unpacking operation, remove the empty box should be merged, and according to the requirements of stacking stacking.